NEW QUESTION # 13
What role would a traditional program manager most likely take on in SAFe?
- A. Business Owner
- B. Product Manager
- C. Scrum master
- D. Release Train Engineer or Value Stream Engineer.
Answer: D
NEW QUESTION # 14
What is NOT a good Definition of Done (DoD)?
- A. The Customer is satisfied with the User Experience.
- B. Nonfunctional Requirements are met.
- C. Code is checked in and merged into main branch.
- D. No must-fix defects exist.
- E. Coding standards have been followed.
- F. All unit tests are passing.
Answer: A
NEW QUESTION # 15
What description best represents Capabilities as defined in SAFe?
- A. Capabilities are simply a level of abstraction above Epics, exhibiting largely the same characteristics and
practices. - B. Capability is a different name for Features, one that is preferred by some organizations.
- C. Capabilities are simply a level or abstraction above Features, exhibiting largely the same characteristics and practices.
- D. Capabilities are simply a different kind of Epic, exhibiting largely the same characteristics and practices.
Answer: C
NEW QUESTION # 16
When does the System Demo happen?
- A. On demand.
- B. After every Iteration.
- C. After continuous integration.
- D. After the Solution Demo, but before PI Planning.
- E. After Pre-PI Planning.
Answer: B
NEW QUESTION # 17
Iteration Goals have business value assigned by the Product Owner.
- A. False
- B. True
Answer: A
NEW QUESTION # 18
(Select 3) According to Lean thinking, how is fast and sustainable flow achieved?
- A. By understanding the full Value Stream.
- B. By reducing batch sizes.
- C. By constant reduction of delays.
- D. By applying subjective governance.
Answer: A,B,C
NEW QUESTION # 19
What is the most effective way to train the System Team members to operate effectively as part of the train?
- A. Have them attend Implementing SAFe training with SPC certification.
- B. Have them review the SAFe Foundations presentation and provide on-the-job training.
- C. Have them attend SAFe for Teams training with all other teams on the train.
- D. Have them attend Leading SAFe training and Scrum Master orientation.
- E. Have them attend Leading SAFe training.
Answer: C
NEW QUESTION # 20
Every Enabler Capability has an Enabler Epic as its parent.
- A. False
- B. True
Answer: A
NEW QUESTION # 21
Select 3) What are typical Kanban classes of service for Agile Teams?
- A. Standard
- B. Accepted
- C. Expedite
- D. Funnel
- E. Fixed date
- F. Review
Answer: A,C,E
NEW QUESTION # 22
You are invited to help an Agile Release Train that has struggled through multiple PIs. They just finished the
second Iteration in the current PI and have nothing to demonstrate at the System Demo. Program stakeholders
are really concerned.
What would you do?
- A. Find a vendor that specializes in integrating system increments form multiple teams.
- B. Re-plan the current PI: De-scope to leave enough time to integrate what you've built during the IP
Iteration. - C. Stop working on any new functionality and fully integrate and test the system; adjust scope based on
learnings. - D. Re-architect the system so that there are no dependencies between the teams and integration is not needed.
- E. Have every team demonstrate their team increment to the stakeholders separately in the team branch.
Answer: C
NEW QUESTION # 23
Once an Epic is approved, an Epic Owner tracks the Epic through implementation.
- A. True
- B. False
Answer: A
NEW QUESTION # 24
When is the Solution Demo conducted?
- A. Mid-PI.
- B. On demand.
- C. At the end of each PI.
- D. At the end of each Sprint.
Answer: C
NEW QUESTION # 25
(Select 3) What are three ways to coordinate across Value Streams?
- A. Empower the Value Stream Engineer to coordinate all teams in the Value Stream.
- B. Apply cadence and synchronization.
- C. Move teams across Value Streams to respond to changing business demands.
- D. Establish Enterprise architecture.
- E. Create a Portfolio Vision and Roadmap.
- F. Fund the Portfolio, not the Value Streams.
Answer: B,D,E
NEW QUESTION # 26
(Select 2) What factors help unlock the intrinsic motivation of knowledge workers?
- A. Well-structured MBOs so people know exactly what's expected of them.
- B. Autonomy.
- C. Ranking individuals for transparency in their contributions to the organization.
- D. Individual and team performance incentives.
- E. Making a contribution.
Answer: B,E
NEW QUESTION # 27
What is the key reason for deploying each team increment to the production-equivalent staging environment?
- A. Teams can verify whether new functionality or Nonfunctional Requirements are compatible with the
current production configuration. - B. It allows the System Team to test the deployability of the Solution.
- C. It enable SAFe teams to Develop on Cadence and Release Any Time.
- D. If something goes wrong with the production environment, teams can switch their staging to perform the role of production.
Answer: C
NEW QUESTION # 28
What are appropriate aspects of the System Architect's role in SAFe?
- A. Approve teams' increments into the mainline branch.
- B. Collaborate with PMs, POs, and Agile Teams to establish the Architectural Runway.
- C. Approve all the design work of teams before they can implement their user stories.
- D. Provide the designs behind each user story.
- E. Collaborate with Scrum Masters to establish the emergent design.
Answer: B
NEW QUESTION # 29
What is the purpose of Solution Intent?
- A. Record and communicate the necessary requirements and design decisions.
- B. Create a comprehensive design document for approval before development begins.
- C. Provide an up-front and static definition of the system's design.
Answer: A
NEW QUESTION # 30
(Select 2) What factors favor centralized decision-making?
- A. High cost of delay
- B. Need for fast decision-making.
- C. Economies of scale
- D. Infrequent decisions.
- E. Appropriate authority level of the decision maker.
Answer: C,D
NEW QUESTION # 31
A Scrum Master asked you to help her use systems thinking to identify the backlog items that would improve
the system as a whole. Select one item that uses systems thinking most effectively.
- A. Involve representatives of department teams in Iteration Planning and Demos.
- B. Make daily stand-ups more engaging and strictly timeboxed.
- C. Increase unit test coverage.
- D. Review the burn-down chart at each retrospective to improve team estimating.
Answer: B
NEW QUESTION # 32
Phase-gate Milestones are not a good predictor of project performance.
- A. True
- B. False
Answer: A
NEW QUESTION # 33
(Select 2) The SAFe Economic Framework guides Value Stream investment decisions by: __________.
- A. Prioritizing work by ROI.
- B. Requiring lightweight business cases for Epics.
- C. Finding Value Streams.
- D. Empowering the Product Owners to sequence the Value Stream Backlog.
Answer: A,C
NEW QUESTION # 34
......